STAGES
OF PROJECT
STAGE
I (01.10.2008. - 26.02.2009.)
Development
and
validation of the
method of determination of heavy metal and REE concentration in water
by ICP-MS
(Realization of the web
site)
STAGE II
(26.02.2009.
-
15.12.2009.)
Characterization of the surrounding
zones of the waters accumulations, using semiquantitative methods
STAGE
III (15.12.2009. - 10.12.2010.)
Development and validation of the
method of determination of heavy metal concentration in soil by ICP-MS.
Implementation of quantitative methods
for the determination of TOC, DOC, THM in drinking waters.
Quantitative determinations of metal
concentrations in waters, sediments and soils
STAGE
IV (10.12.2010. - 15.05.2011.)
Quantitative methods for
characterization of the surrounding zones of the waters accumulations,
from the
point of view of the heavy metals and REE concentrations.
Characterization of the collection sites
and the determination of the origin and the supply mechanism of the
surface
waters
STAGE
V (15.05.2011. - 15.09.2011.)
Characterization of the selected waters
and correlation of the data obtained by ICP-MS, IRMS, GC-MS
|